This unit specifies the outcomes required to erect, alter and dismantle scaffolding at the basic level, consisting of scaffolding work connected with the operation or use of modular or pre-fabricated scaffolds, cantilevered materials hoists with a maximum working load of 500kg, ropes and gin wheels, safety nets and static lines, and bracket scaffolds (tank and formwork) for licensing purposes.
This unit covers the scope of work to plan the job, select and inspect equipment, set up tasks, erect scaffolding and scaffolding equipment, and dismantle scaffolding and scaffolding equipment.
This unit is based upon the National Standard for Licensing Persons Performing High Risk Work.
This unit states and territories’ licensing requirements in their current form. Any alteration will result in a unit that is not acceptable to regulators for licensing purposes.